0
%
Home
About
Company Profile
Mission And Vision
Our Services
Products
Air Handling Equipment
Air Handling Units
Air Washer/Scrubber Units
Clean Rooms Products
Clean Room Modular Panels
Clean Room Doors
Process Chillers
Air Distribution Products
Prefabricated Ducting
Operation Theatre Plenums
Flow Control Dampers
Hepa Terminal Boxes
Brochure
Infrastructure
Clients
Contact
Home
About
Company Profile
Mission And Vision
Our Services
Products
Air Handling Equipment
Air Handling Units
Air Washer/Scrubber Units
Clean Rooms Products
Clean Room Modular Panels
Clean Room Doors
Process Chillers
Air Distribution Products
Prefabricated Ducting
Operation Theatre Plenums
Flow Control Dampers
Hepa Terminal Boxes
Brochure
Infrastructure
Clients
Contact
Home
About
Company Profile
Mission And Vision
Our Services
Products
Air Handling Equipment
Air Handling Units
Air Washer/Scrubber Units
Clean Rooms Products
Clean Room Modular Panels
Clean Room Doors
Process Chillers
Air Distribution Products
Prefabricated Ducting
Operation Theatre Plenums
Flow Control Dampers
Hepa Terminal Boxes
Brochure
Infrastructure
Clients
Contact
Operation Theatre Plenums
Home
›
Operation Theatre Plenums
NABH Guidelines for Modular General and Super-Specialty Operation Theatres
The System we supply maintains (as required by NABH Revised Guidelines 2018 issue No 4, Issue Date 11/18)
A Minimum of 20 Air Changes Per Hour
Fresh Air Component Will Be Minimum of 4 of the 20 Air Changes.
100% Air Change can be Provided if Necessary
One AHU will be Dedicated to each Operating Theatre.
Air Supplied will be through Terminal HEPA Filter Fitted at the Outflow in the Plenum,
The Air Flow on the Bed will be Laminar and Downwards towards the Operating Bed,
The Laminar Flow will have an Air Velocity of 25-35 Feet per Minute at the Plenum.
The Laminar Filtration Size will Extend one Foot on all Sides of the Operating Table.
Quality of Air Supplied will be Class 100/150 Class 5 at the Plenum Grill level if Required.
Temperature Maintained will be 21° 23°C. For Joint Replacement it will be 18″ 13°C
Relative Humidity will be Maintained at 55%. Any other Percentage, If Required. as per NABH can be Incorporated.
Temperature, Relative Humidity & Room Pressure can be Monitored & Controlled with Auto Machine System.
Fresh Air Intake will be from Uncontaminated Area.
The Entire System Aircon can be Automated with a Touch Screen Console for Monitoring.
We Manufacture & Install Modular Operation Theatres Along with HVAC & Clean Room Project Equipment as listed Below:
Clean room/Ceiling modular wall panels (PCGI, PPGI, HPL),
Clean room doors/automated doors.
Risers & Prefabricated Ducts Per IS/SMACNA Standards.
Aluminium Covings.
Laminar Flow Plenum with HEPA/Mini Pleat HEPA Filters & SS Perforated Grills.
Antistatic Epoxy Flooring.
AHUs to FDA standards.
Lighting (Except the Pendant).
Operation Theatre Plenums
Request a Call
Name
Email
Phone No
Message
Send
Hide similarities
Highlight differences
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
Image
SKU
Rating
Price
Stock
Availability
Add to cart
Description
Content
Weight
Dimensions
Additional information
Click outside to hide the comparison bar
Compare